300 E. Mallard Dr. Suite 350 Boise, ID 83706

News


June 2nd , 2015

IMG_2073                           IMG_2096

As the City of Meridian celebrates the opening of their new laboratory, administrative office, and operations control center buildings, we are reminded of the amazing team we worked with to help make this project such a success.

A special thanks to Tammy DeWeerd, Charlie Roundtree, Keith Bird, Joe Borton, Luke Cavener, Genesis Milam, David Zaremba, Tom Barry, John McCormick, Warren Stewart, Clint Dolsby, David Allison, Tracy Crane, Laurelei McVey, Travis Kissire, Crystal Green, Deana Smith, Eric Jensen, Joel Meusch, Patrick Cotton, Dave Gassel, Tony Bernard, Jackson Allen, and the entire Wastewater Division of the Public Works Department.

There were also numerous design, engineering, trade, construction, and supply contractors that contributed their services to the success of the project.

Engineering and Design Team

Johnson Architects
Lochsa Engineering
Musgrove Engineering
The Land Group
Sprague Solutions
Catapult 3
Carole Leong
STRATA

Construction and Supply Team

Beniton Construction
Alta Construction
Cascade Fence
Total Maintenance Solutions
Quality Concrete
Slattery Mitchell
Mountain Industries
Dura Top Industries
Desert Sage Wall Systems
Modern Roofing
D&A Door & Specialties
Hardware Sales & Service
Overhead Door
Custom Glass
Northwest Interiors
Creechley Tile & Marble
Designer Floors
Office Environment
All Colors Painting
SBI Contracting
Northwest Sales & Distribution
Schindler Elevator Corporation
Absolute Fire Protection
Lacy Mechanical
Hobson Fabricating Corporation
Energy Enterprise Group


<< Back to Index